Brunel house
Portsmouth

Royal Navy offices

Tags

mod, offices

Updates

2010-12-00
First two storeys are boarded up, and the reception is tight but two windows at the rear are open and there are squatters on the 5th floor.

2012-08-29
The ground floor on the rear has been boarded up tightly and the ground is kept clear.
The front has been tidied up too.

2012-08-29
There is possibly access down the side of the building.

Name:
Email:
Ignore:
Ignore:
Date: